Bujumbura buries 40,000 tonnes a year. Almost all of it is still worth something.

A public–private programme to rehabilitate the Buterere landfill and build Burundi's first municipal circular waste system. Keep scrolling: you'll travel the whole programme.

Forty-three years of waste, in the open

Buterere and Mubone have taken Bujumbura's waste since 1983 and 2009. Nothing is sorted, nothing is capped, and leachate drains toward the Lake Tanganyika basin.

2026 Today

Roughly 730,000 tonnes in place across both sites, with 35,000 to 40,000 more arriving every year. Leachate drains toward the lake basin untreated.

730,000 tin place, estimated

It starts at the kerb

Separate collection across one defined quartier: households and markets, on a route that actually runs. Without this step, everything downstream gets mixed again.

4 tper day in the pilot phase

One stream becomes four

Every line has an identified destination before it is separated. Select a fraction to see what the programme does with it.

The organic fraction returns to the soil

Composting windrows, then anaerobic digestion from phase 4. The compost goes to peri-urban farms around Bujumbura, where soil depletion is a working constraint.

~87%diverted from burial at full capacity

Only the residual is buried

Lined, with leachate capture and a cap. It is the only fraction left, and the end of untreated runoff toward the Lake Tanganyika basin.

~13%of the stream, against all of it today

From 4 to 630 tonnes a day, in five phases

Each phase is separately fundable and proves the next. Pick a phase and the coverage spreads across the model.

0.6%of the municipal stream covered

USD 95.6M in total. 37.5M to raise.

The balance is covered by operating revenues, partner contribution and in-kind support.

USD 58.1M — covered within the plan
USD 37.5M — to be raised
$95.6M

Total programme investment across five years.

$37.5M

Net financing need: the share for grant and blended finance.

$450k

Pilot-phase funding request.

The pilot request is under 0.5% of total programme investment. It is what unlocks everything else, because it produces the operating data on which every later financing decision depends.

Who applies decides what can be funded

The main barrier is not the project. It is applicant type. Switch applicants on to see the windows open.

4 / 12

windows accessible with the company alone.

Development bank

African Development Bank

Infrastructure finance and blended instruments for phases 3 to 5.

European cooperation

European Union Delegation

Demonstration grant for the pilot phase.

Bilateral cooperation

ENABEL / TAKIWAMA

Technical assistance on waste in Burundi.

United Nations system

UN Environment Programme

Circular economy, plastics, the Lake Tanganyika basin.

Thematic foundation

Africa Circular

Dedicated African circular-economy funding.

Specialised facilities

African Water Facility, GEF, EEP Africa

Windows with a mandated applicant status.

Let's talk about the pilot

The full pack (five-phase plan, cost structure, financial model and investment note) is available in French and English.

Programme lead
PrimeCleanSolutions (PCS)
in partnership with Nivion
Location
Bujumbura, Burundi
Email
contact@bzwtp.org
Working languages
FrançaisEnglishKirundiKiswahili