Buterere and Mubone have taken Bujumbura's waste since 1983 and 2009. Nothing is sorted, nothing is capped, and leachate drains toward the Lake Tanganyika basin.
First site opened
Second opened, still active
Estimated historic stock
Arriving each year
A reconstruction of the mass deposited across both sites, from opening in 1983 to planned remediation. Drag the slider — or rotate the terrain itself.
Buterere begins taking Bujumbura's waste. No lining, no cover, no separation — the practice that every later tonne inherits.
Select a fraction to see what the programme does with it. The organic share is measured on site; the others are indicative until the pilot-phase characterisation campaign.
The images marked below will be replaced with photographs of Buterere itself as soon as they are available.
images/buterere-site.jpg
images/collection.jpg